DBF Progress

Team Status
Aerodynamics 03/14 - Basic wing structures and coverings are completed. Construction of the payload containers has begun as well, the ends of which have been shaped for smoother airflow. Some skin has been applied to the fuselage as well.
Landing Gear 03/14 - Construction of the landing gear has started, the basic layout completed. The gear still needs to be mounted on the aircraft, but is well on it's way to completion
Payload 03/14 - The payload release mechanism has been tested and proven, and will be installed in the wing soon.
Electrical / Propulsion 03/14 The engine mount has been drilled and prepared for the motor, and some control surface servos installed.